Awarded projects
Active Control, based on their experience in developing and implementing projects in different fields, has developed a wide range of solutions in the domestic market, within projects we can highlight, We mention the following:
Maintenance and updating Autopista Central Control System, consisting in the implementation and updating their drivers, integration of other systems, data centralization, wireless communication systems for different areas, SCADA system for control and monitoring of the highway, It is consisting of 28 island.
Update systems control group ENEL, where solutions are delivered for measuring dimensions and tributaries, levels, third-party data centralization, for different reservoirs and power plants. RTU communication technology with GPRS.
System variables measuring electrical transmission lines for Transelec, It is consisting in the implementation of wireless devices that are located in the transmission lines based on critical points of operation, measuring variables such as: line current and temperature, slope of the line. climatological variables are also measured as such: solar radiation, rainfall, room temperature, etc. The objective of the system is to allow the system to inject energy without the system suffers a loss of connection fault lines. Additionally, the system can incorporate higher performance system for dynamic analysis line, where I mention Podem: ampacity, sag&swell, Crown effect, etc.
Implementation control system Fresenius Kabi, It is consisting of the implementation of the process control system PCS 7 (1.000 I/O y 15.000 tags), to centralize, monitoring and control of production plants. This system centralizes field instrumentation under Profibus DP communication protocols, 150 under protocol control valves ASI, decentralized periphery, etc.
System variables measuring electrical transmission lines for Minera Los Pelambres, It is consisting in the implementation of wireless devices that are located in the transmission lines based on critical points of operation, It includes the implementation of SCADA system for monitoring and control line that includes: display measurements of electrical variables and climatological, developing corona, ampacity, sag&swell, etc.
Measurement and monitoring of acid in leach pads Minera Lomas Bayas, which it involves the implementation of a wireless protocol implementation by ISA100. Son 12 slave devices communicating with a data concentrator, which then sends the information to a DCS.
Monitoring System for Central Operation Mine Colbun, It is the supply, implementation and commissioning of the system including 24 IP CCTV technology, where 20 are to inside the central and 4 They are outdoor perimeter control and surveillance.